Siemens SITRANS WFS300 Руководство по эксплуатации - Страница 24
Просмотреть онлайн или скачать pdf Руководство по эксплуатации для Промышленное оборудование Siemens SITRANS WFS300. Siemens SITRANS WFS300 42 страницы. Sensing heads
Commissioning
6.2 LVDT Output
6.2
LVDT Output
Zero adjustment (if required)
1. Connect a voltmeter across the LVDT green and yellow (or yellow and white; hazardous
LVDT) wires.
2. With no load applied to the sensing plate, observe the V AC reading on the voltmeter.
3. If the LVDT output is 0.10 ± 0.05 V AC, skip to Span Test, otherwise, proceed as follows:
– Loosen the locknut on the LVDT threaded core.
– Turn the core in/out of the LVDT until 0.10 ± 0.05 V AC is obtained.
– Tighten the locknut, ensuring the measured value is maintained.
①
②
Note
Ensure the new position of the LVDT core allows free movement within the LVDT bore.
24
Locknut
Moving beam
③
LVDT core
④
LVDT
Operating Instructions, 03/2021, A5E32880243-AC
SITRANS WFS300