- ページ 24

産業機器 Siemens SITRANS WFS300のPDF 取扱説明書をオンラインで閲覧またはダウンロードできます。Siemens SITRANS WFS300 42 ページ。 Sensing heads

Siemens SITRANS WFS300 取扱説明書
Commissioning

6.2 LVDT Output

6.2
LVDT Output
Zero adjustment (if required)
1. Connect a voltmeter across the LVDT green and yellow (or yellow and white; hazardous
LVDT) wires.
2. With no load applied to the sensing plate, observe the V AC reading on the voltmeter.
3. If the LVDT output is 0.10 ± 0.05 V AC, skip to Span Test, otherwise, proceed as follows:
– Loosen the locknut on the LVDT threaded core.
– Turn the core in/out of the LVDT until 0.10 ± 0.05 V AC is obtained.
– Tighten the locknut, ensuring the measured value is maintained.
Note
Ensure the new position of the LVDT core allows free movement within the LVDT bore.
24
Locknut
Moving beam
LVDT core
LVDT
Operating Instructions, 03/2021, A5E32880243-AC
SITRANS WFS300