Cisco 12016 Инструкции по замене Руководство - Страница 25

Просмотреть онлайн или скачать pdf Инструкции по замене Руководство для Сетевой маршрутизатор Cisco 12016. Cisco 12016 32 страницы. Blower module and air filter for cisco 12016, cisco 12416, and cisco 12816 router
Также для Cisco 12016: Инструкция по распаковке Руководство (28 страниц), Информационный лист (9 страниц), Руководство по эксплуатации (16 страниц), Инструкции по замене Руководство (18 страниц)

Cisco 12016 Инструкции по замене Руководство
Set a blocking plate into the hold-down bracket so that the blank side of the blocking plate is against the
Step 8
heads of the bolts in the side of the scissor-jack platform and the open holes in the blocking plate align
with the bolt holes in the top of the pallet.
Insert bolts through each of the hold-down bracket holes and into the holes in the top of the shipping
Step 9
pallet, then use the 9/16-inch (14-mm) wrench to tighten the bolts.
Turn the scissor-jack screw slowly clockwise to collapse the scissor-jack platform and raise the base of
Step 10
the scissor-jack platform until the weight of the chassis and scissor-jack platform is absorbed by the
pallet. Continue turning the scissor-jack screw clockwise to close the scissor-jack platform and lift the
base of the scissor-jack platform until it is completely closed (the screw can not be turned).
Repackaging the Chassis for Shipment
To repackage the chassis, use
Verify that the anchor clips fastening the chassis to the scissor-jack platform are installed correctly and
Step 1
that the bolts are tight.
Verify that the bolts fastening the hold-down brackets to the sides of the scissor-jack platform and the
Step 2
top of the pallet are tight.
If required, place the accessories package against the back panel of the router on the extended deck of
Step 3
the pallet body.
To install the U-shaped, corrugated side panels, use
Step 4
a.
b.
c.
Because the two U-shaped side panels are identical, interlocking them in this fashion maintains the
Note
correct overall container dimensions and strength.
To fasten the two U-shaped side panels together, use
Step 5
a.
b.
c.
d.
e.
Set the corrugated top cap on top of the container side panels and push it down.
Step 6
78-16082-01
Figure 17
Set the long side of one panel on the pallet base such that it sits inside the bead-boards attached to
the outside corners of the pallet riser blocks and against the side of the pallet platform.
Set the narrow end flaps of the panel inside the bead-boards attached to the outside corners of the
pallet riser blocks.
Position the opposite U-shaped side panel such that one narrow end flap is inside the narrow end
flap of the first U-shaped side panel, while the other narrow end flap is outside the narrow end flap
of the first U-shaped side panel.
Starting at one of the top holes on one narrow side panel, align the holes in the inner and outer
corrugated panels.
Open a plastic locking clip by pulling the wedge block out of the clip.
Insert the clip into the hole, then pivot the wedge block into the opening on the body of the clip and
push firmly until it snaps into place, spreading the butterfly tabs and locking the inner and outer side
panels together.
Repeat Step
a.
through Step
Repeat Step
a.
through Step
Cisco 12016, Cisco 12416, and Cisco 12816 Router Chassis Replacement Instructions
as a reference and follow these steps:
Figure 17
Figure 17
c.
for the remaining holes on the narrow side panel.
d.
for the opposite narrow side panel.
Removing and Installing the Chassis
as a reference and follow these steps:
as a reference and follow these steps:
25