Cisco Catalyst 3030 Руководство по началу работы - Страница 18

Просмотреть онлайн или скачать pdf Руководство по началу работы для Сетевое оборудование Cisco Catalyst 3030. Cisco Catalyst 3030 34 страницы. Cisco systems catalyst blade switch getting started guide

Cisco Catalyst 3030 Руководство по началу работы

Installation Warning Statements

Other Management Options

Installation Warning Statements
Warning
Warning
Warning
Warning
Cisco Catalyst Blade Switch 3030 Getting Started Guide
1-18
You can use SNMP management applications such as CiscoWorks. You also can
manage it from an SNMP-compatible workstation that is running platforms such
as SunNet Manager.
See the
"Accessing Help Online" section on page 1-23
documentation.
This section includes the basic installation warning statements. Translations of
these warning statements appear in the Regulatory Compliance and Safety
Information for the Cisco Gigabit Ethernet Switch Module for the Dell Server
Chassis document that shipped with the switch.
To prevent the switch from overheating, do not operate it in an area that
exceeds the maximum recommended ambient temperature of 113°F (45°C). To
prevent airflow restriction, allow at least 3 inches (7.6 cm) of clearance around
the ventilation openings. Statement 17B
Class 1 laser product. Statement 1008
This equipment must be grounded. Never defeat the ground conductor or
operate the equipment in the absence of a suitably installed ground conductor.
Contact the appropriate electrical inspection authority or an electrician if you
are uncertain that suitable grounding is available. Statement 1024
Only trained and qualified personnel should be allowed to install, replace, or
service this equipment. Statement 1030
Cisco Catalyst Blade Switch 3030 Getting Started Guide
for a list of supporting
78-17052-01