ClearSpan 104903 Инструкция по сборке Руководство - Страница 13

Просмотреть онлайн или скачать pdf Инструкция по сборке Руководство для Комплект для теплицы ClearSpan 104903. ClearSpan 104903 19 страниц. Premium solar star greenhouse

Install the Tek screws (FA4555B) and neo-bonded
washers (102921), used to attach the metal ridge cap, in
a position that will not interfere with the installation of the
next length of ridge cap. The ridge cap must sit flush on
the adjacent section of ridge cap.
Ridge Cap
The ridge cap regarding the second set of installed roof
panels will extend beyond the inside edge of the panel a
few inches when properly installed. See previous
diagram.
41. Move to the door end of the greenhouse and repeat
the installation of the flat brackets for that end of the
greenhouse. (See Step 30 for the bracket locations.)
42. Install the long roof panel and attach it to the lower
roof support plates and to the square flat brackets
installed in the previous step.
43. Move to the back of the greenhouse and install a
non-vented (short) roof panel.
44. Attach another section of ridge cap to the peak in
the location shown in the next diagram using Tek
screws and neo-bonded washers.
Visit www.ClearSpan.com for additional products and customer assistance.
NOTE: This section will extend beyond the inside edge
of the roof panel a few inches when properly installed.
45. Attach flat brackets and repeat the steps to attach
another long roof panel.
46. Install the second vented, short roof panel.
Install ridge cap here
12 of 18