EG4 MPPT100-48HV Руководство пользователя - Страница 4
Просмотреть онлайн или скачать pdf Руководство пользователя для Зарядное устройство EG4 MPPT100-48HV. EG4 MPPT100-48HV 10 страниц. Mppt charger 100a 48vdc
INSTALLATION
Unpacking and Inspection
Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You
should have received the following items inside of the package:
1. The unit × 1
2. User manual × 1
3. RS485 BMS communication cable × 1
Preparation
Before installation, please take off bottom cover by removing the two screws.
Mounting the Unit
Consider the following points before selecting where to install:
1. Do not mount the charger on flammable construction
materials.
2. It is recommended to mount the unit on a solid surface,
preferably a wall.
3. Install this charger at eye level to allow the LCD screen
to be read at all times.
4. The ambient temperature should be between 32°F to
131°F (0°C to 55°C) to ensure optimal operation.
5. Please ensure sufficient spacing as shown in the diagram
to the right to guarantee proper heat dissipation and to
have enough space for removing wires.
SUITABLE FOR MOUNTING ON CONCRETE OR
OTHER NON-COMBUSTIBLE SURFACE ONLY.
3