ACR Heat Products The Astwood AW1MF Teknik Kılavuz - Sayfa 10
Soba ACR Heat Products The Astwood AW1MF için çevrimiçi göz atın veya pdf Teknik Kılavuz indirin. ACR Heat Products The Astwood AW1MF 13 sayfaları. Multifuel stove
Commissioning Check List
(Please mark box when completed)
Ensure the serial number has been recorded on the front of this manual for
any future use
Ensure the door seals are in good condition and that the glass is secured
correctly in the door (do not over tighten the glass as this will prohibit its
expansion and could cause the glass to crack)
Ensure that all internal components are fitted correctly (these may have
shifted in transit)
Ensure that the appliance operates correctly during the first firing
Ensure the customer is aware that fumes may be given off during the first
firings as the paint cures
Advise the customer on the safe operation of the appliance
Leave the instruction manuals, operating tool and glove for the
customer's use.