Air Change WM-ERV Kurulum ve Bakım Kılavuzu - Sayfa 8

Klima Air Change WM-ERV için çevrimiçi göz atın veya pdf Kurulum ve Bakım Kılavuzu indirin. Air Change WM-ERV 12 sayfaları. Wall mount energy recovery ventilator

Air Change WM-ERV Kurulum ve Bakım Kılavuzu
• Heat exchanger is secured in place by two screws that secure the heat
exchanger to the cabinet. This ensures that the heat exchanger can only be
removed from inside the room.

3.2.4 Filters

• Filters are supplied and fitted in the factory. A single filter is inserted and
removed via the return air inlet grid and provides filtering for both fresh air
inlet and return air inlet of the heat exchanger.
IMPORTANT: Never operate unit without filters fitted to the return
and fresh air intakes.
IMPORTANT: If these units are being used during construction when
adhesive, sealers, ducts, new and used carpets are being installed make
sure all equipment is fitted and adequately protected. We recommend
using disposable or temporary filters during commissioning and during
pre-hand over running.

3.2.5 Electrical

• Internal controls are all 240V supply. Wiring is done in accordance to
Australian Standards and specific state electrical authorities.
• Single phase fan motors are internally protected and there is no need for
external overloads in the ventilation unit.
3.3

Schematic Dimensional Data and Wiring Diagram - Following

Pages.
WM-ERV Manual 2005.2.doc2
8