Da-Lite Advance MPS-ACM Talimatlar - Sayfa 3

Raflar ve Standlar Da-Lite Advance MPS-ACM için çevrimiçi göz atın veya pdf Talimatlar indirin. Da-Lite Advance MPS-ACM 4 sayfaları. Mobile plasma stand automated confidence monitor

2. Insert the Caster stems or Glide stems into the Base. See
Figure 1. Must go in straight.
3. Insert tube enclosures shown.
4. Insert two Columns into the Base and install the fasteners
shown. Leave loose at this time.
5. Slide the Top Assembly down the Columns. See Figure
2. Position the Top by tightening both Knobs. Make sure
unit is level.
6. Tighten the fasteners at the bottom of the Columns.
7. Attach Zee-Bar Plate to Hinge. See Figure 3.
8. Attach the Links to the outside of the Zee Bar
Assembly.
9. Mount the Hanging Brackets to the back of the Plasma
Unit utilizing all the fastener points recommended by the
plasma manufacturer. See Figure 4.
13
Figure 1
11
KNOBS TO
HOLD POSITION
Figure 2
D
F
LINK
Figure 3
Figure 4
A
12
HINGE
C
G