4. OPERATOR INSTALLATION

4.1. TOOLS

1.
Set of spanners
2.
Set of slotted and cross screwdrivers
3.
Set of drills for metal
4.2. REQUIRMENTS TO DOOR INSTALLATION
P rior to installation check if the door is
properly balanced and moves smoothly when
automatically operated.
M ake sure, that minimal clearance between
the ceiling and the top point, when the door is
moving, is not less than 45 mm (pic. 1).
C heck, that the door leaf top roller is in the
horizontal part of the guide rail, when the door
is completely closed (pic. 2).
M ount the door control panel at a height not less
than 1.5 m close to the door.
4.3. CONNECTION OF OPERATOR AND GUIDE
1. Put the operator bushing (4) on the shaft (5).
2. I nsert the operator unit into the hole on the
guide (3).
3. F asten the operator with U-brackets (2) and
tapping screws (1).
1.
2.
3.
4.
5.
6
4.
Set of drills for concrete
5.
Pliers
6.
Hacksaw for metal
Tapping screws
U-bracket
Guide
Bushing
Motor shaft
7.
Electric drill
8.
Tape measure (folding rule)
45 mm