Akw M17 DigiPump Kurulum ve Kullanıcı Bakım Talimatları - Sayfa 14

Su Pompası Akw M17 DigiPump için çevrimiçi göz atın veya pdf Kurulum ve Kullanıcı Bakım Talimatları indirin. Akw M17 DigiPump 20 sayfaları. Digipump

Commissioning Checks
Commissioning Checks
As a general precaution and check before installation, always ensure the supply pipework
to the shower has been fully purged with at least 20 litres (2 buckets) of water through it
before the flow sensor is installed. Any building debris in the water supply will adversely
affect the sensor function and may also damage the shower heater/mixer.
Install pump according to these instructions. Failure to do so may void warranty.
Confirm all push-fit pipes are fully inserted 20mm into fittings.
Brush out all dust, grit and debris
from shower tray
Thoroughly clean out waste
Confirm shower water supply pipework is flushed
before connecting to the shower sensor via the filter
Turn on power to Pump
Turn shower on Low Flow and confirm pump
operates after Start Delay (default 5 secs.)
Run for 2-3 mins
Set shower to Maximum Flow
Follow the Calibration setting, adjust pump speed on
controller to match maximum shower flow
Switch shower OFF.
Pump will RUN-ON
Adjust RUN-ON and repeat until tray is cleared and
pump stops with minimum RUN-ON
If you experience problems see
Problem Solving section
14