Advance acoustic 9087331020 Kullanım Kılavuzu - Sayfa 20

Yıkayıcı Advance acoustic 9087331020 için çevrimiçi göz atın veya pdf Kullanım Kılavuzu indirin. Advance acoustic 9087331020 20 sayfaları.

ENGLISH

MAINTENANCE

The lifespan of the machine and its maximum operating safety are ensured by correct and regular maintenance. The following chart
provides the scheduled maintenance. The intervals shown may vary according to particular working conditions, which are to be
defined by the person in charge of the maintenance.
WARNING!
Maintenance procedures must be performed with the machine switched off and the batteries/battery charger
cable disconnected.
Moreover, carefully read the instructions in the Safety chapter.
All scheduled or extraordinary maintenance procedures must be performed by qualified personnel, or by an authorised Service
Center.
This Manual describes only the easier and most common maintenance procedures.
For other maintenance procedures shown in the Scheduled Maintenance Table, refer to the Service Manual that can be consulted
at any Service Center.

SCHEDULED MAINTENANCE TABLE

Procedure
Battery charging

Squeegee cleaning

Brush/pad cleaning
Tank and vacuum grid with float cleaning, and cover gasket
check

Squeegee blade check and replacement

Solution filter cleaning

WET battery fluid level check
Screw and nut tightening check
Brush/pad-holder motor carbon brush check or replacement
Vacuum system motor carbon brush check or replacement
(1) And after the first 8 working hours.
(2) This maintenance procedure must be performed by an authorised Advance Service Center.
18
INSTRUCTION FOR USE
Daily, after using
SC450 - 9099602000
Weekly
the machine
Every six months
Yearly
(1)
(2)
(2)