Draper nocturne+ c Talimatlar Kılavuzu - Sayfa 3
Projeksiyon Perdesi Draper nocturne+ c için çevrimiçi göz atın veya pdf Talimatlar Kılavuzu indirin. Draper nocturne+ c 10 sayfaları. Outdoor crank-operated projection screen
Ayrıca Draper nocturne+ c için: Kurulum ve Çalıştırma Talimatları (4 sayfalar), Talimatlar Kılavuzu (6 sayfalar), Talimatlar Kurulum ve Çalıştırma (8 sayfalar)
Nocturne+ C
Section 2 - Mounting Case with Brackets
Caution: Mounting Brackets required for proper spacing of unit off the wall for Side Channel alignment.
1. Attach Mounting Brackets to the wall using #10 flat head screws installed flush with bracket.
Please Note: Be sure to use AT LEAST 2 of the top mounting holes.
2. Attach Headbox to brackets and tighten Set Screws.
3. Mount the Side Channels
(Section 4)
1
Figure 3
Section 3 - Mounting Case Directly to Wall
1. Attach Mounting Brackets to Case as a spacer between Case and wall.
Please Note: Leave a 1¾"
(44mm)
, and tighten set screws.
(Fig. 4)
2. Remove roller assembly.
A. Remove screws from bottom of Case, remove Cover and set aside
B. Remove Quick Release Pin from Idler End of Roller Assembly.
C. Remove Roller Assembly, Idler End first, and set aside.
3. Mount to Ceiling / Wall.
A. Using mounting holes in endcaps as a guide
both ends of Case.
B. Attach to mounting surface using appropriate fasteners.
Please Note: Installer is responsible for selecting mounting hardware
appropriate for site conditions.
4. Proceed to Section 4
.
(Installing Cable Guides)
Remove
A
cover.
B
Remove quick
release pin.
.
2
gap between Endcap and Mounting Bracket
, drill pilot holes on
(Fig. 6)
Figure 5
Remove roller
assembly.
3
Figure 4
.
(Fig. 5)
Leave a 1 "
gap.
(44mm)
C
Remove screws from
bottom of case.
Figure 2
Tighten
set screws.
Attach
mounting bracket
as spacer and
tighten set screws.
Figure 6
CEILING
CEILING
MOUNT HOLES
MOUNT HOLES
page 3 of 10
WALL
WALL
MOUNT HOLES
MOUNT HOLES