Drawell ZNHW-500ML Kullanıcı Kılavuzu - Sayfa 5
Laboratuvar Ekipmanları Drawell ZNHW-500ML için çevrimiçi göz atın veya pdf Kullanıcı Kılavuzu indirin. Drawell ZNHW-500ML 10 sayfaları.
5. Glass pieces should be handled with care when installing, all the joints must be coated
with vacuum grease.
6. Can not be used under the environment full of flammable, explosive and narcotic gas.
IV. Main technical parameters
Capacity of rotation bottle:5L
Heating power of water bath:2000VA
Collection bottle capacity: 3L bottom discharge Fluctuation range of water bath: 180mm
Rotation speed:10~110r/min Frequency control of motor speed
Power: ~220v/50Hz
Rotating motor: 120VA
AC induction
Dimensions:950×500×1200mm
Weight (net) : 50kg
V. Installation steps
1. After unpacking, check according to the packing list, and assemble according to Figure
I after scrubbing and drying them.
2. Principal machine should be aligned with water tank. If the ground surface is not flat,
smooth down by using hard objects.
3. Install the four-way valve: connect the valve to the principal machine, encase the
forcing screw into four-way flange mouth, encase the nylon collar, align the internal jointing
washer, and screw the forcing screw tightly.
4. Install the condensation pipe: insert it into the four-way ball-milling position and keep
vertical, screw the fixed packet ring with the slotted screwdriver tightly, and then screw the
cross clip tightly. Fix the condensation pipe with four-way butt joint through a special
connector.
5. Install the condensation elbow: connect the concave ball milling of condensation
elbow with the four-way ball milling, and clamp with the ball milling mouth clip; connect the
convex ball milling of condensation elbow with the connection bottle, and install the ball
milling mouth clip.
6. Insert the deeding tube into the standard concave milling mouth of four-way valve.
7. Adjust the position of all brackets, tight degree of screws, and fitness degree of glass
joints.