Alentec & Orion NEX-U 23800 Parça ve Teknik Servis Kılavuzu - Sayfa 4

Kontrolör Alentec & Orion NEX-U 23800 için çevrimiçi göz atın veya pdf Parça ve Teknik Servis Kılavuzu indirin. Alentec & Orion NEX-U 23800 11 sayfaları. U-net central processing unit

EN

INSTALLATION AND CONFIGURATION

For further details about the installation and configuration of the equipment, check the monitoring system "Installer's Guide".
DEVICE ATTACHMENT
Optionally, the device can be fixed by using the assembly holes (2).
RESET OF THE DEVICE
When the device is powered through the DC Jack by using the provided transformer, the POWER LED will light on,
indicating that the equipment is turned on. The equipment is turned off by disconnecting the power supply. To restart
the unit, press the button briefly. The POWER LED will remain on, while the other LEDs will turn off and on sequentially.
CAN BUS END OF LINE RESISTOR CONFIGURATION
Once the equipment is connected, follow the instructions below:
1. To activate the end of line resistor, switch the two switches E.O.L 1 and 2 in the ON position.
2. To deactivate the end of line resistor, switch the two switches E.O.L. 1 and 2 in the OFF position.
LED AND DIAGNOSTIC INDICATORS
LED
DESCRIPTION
POWER
Shows that equipment is connected
STATUS
Shows the operating status of the equipment
If it lights up, it means that the device is correctly
ONLINE
connected.
RX
The light flashes when the device is receiving data
The light flashes when the device is transmitting
TX
data

TECHNICAL FEATURES

POWER SUPPLY
VOLTAGE
2 x CAN BUS 4xUSB, 1 x LAN RJ45,
CONNECTIONS
STATUS LEDS
PESO
4
105 274 R. 05/23
Alentec & Orion AB Grustagsvägen 4, SE-13840, Älta, SWEDEN · [email protected] · www.alentec.com
5 V DC
1 x HDMI, 1 x USB 3.0
5
560 g
DIMENSIONS
153 mm (6.02 in)
44 mm
(1.73 in)
102 mm
(4.01)