CommScope FACT Kurulum Talimatları Kılavuzu - Sayfa 5
Endüstriyel Ekipmanlar CommScope FACT için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. CommScope FACT 9 sayfaları. Fanout fixation kit
Ayrıca CommScope FACT için: Kurulum Talimatı (8 sayfalar), Kurulum Talimatı (12 sayfalar), Kurulum Talimatı (8 sayfalar)

6.
Routing and termination on
FACT-xESPL (splice element)
6.1.
Termination
6.1.1.
Slide on the CTU bracket. Mark the loose tubes at 4
cm of the tube holder.
6.1.2.
Strip the loose tubes at the marked point and
clean the fibers.
6.1.5.
Feed the fibers into the transportation tubes.
Note: These transportation tubes have to be cut to 430mm
(for FACT-xESPL) first!
6.1.6.
Slide the transportation tube over the loose tube
into the tube holder. Make sure the transportation tube is
pushed to the end of the tube holder.
6.1.7.
Slide the other side of the transportation tubes in
the 2nd tube holder. Avoid crossings. Make sure that the
transportation tubes are pushed in, until the end.
6.1.8.
Open the lids. Push / slide all transportation tubes
one by one into the tray.
© 2018 CommScope, Inc. All Rights Reserved
Page 5 of 9