Anderson Oper-SRB Kullanım Kılavuzu - Sayfa 8

Brülör Anderson Oper-SRB için çevrimiçi göz atın veya pdf Kullanım Kılavuzu indirin. Anderson Oper-SRB 12 sayfaları.

When the burner runs in direct firing application, the max working temperature will be
the process temperature.
When the burner runs at indirect firing application, the max working temperature will
be the preheated combustion air temperature.
To ensure the burner working performance, the heat flux from radiant tube surface must
be considered. Below chart shall be checked for heat flux calculation.

5. Burner maintenance

The burner should be inspected regularly. This is especially important after a prolonged
period of shut-down.
5.1 Inspection of the nozzles
During the first month of operation of the burner, inspection of the nozzle must be carried
out every week. During the second month, the period between inspections can be
extended to two weeks. Anderson recommends that each nozzle is inspected at least once
every month. Every time to check the burner, it should be pull out from furnace.
Anderson Thermal Soluions(Suzhou)Co. Ltd.
Anderson Thermal Solutions – ANM75 Burner Operation Manual
Chart 1 Radiant heat flux vs. furnace temperature
Metal
Radiant tube surface heat flux / kW·m
Ceramic
-2
Copyright©2023
2