5.
For RF1 Modules disconnect the two-wire solenoid connector from the
circuit board. Note: RF5 Zero modules will not have this connector, so this
step may be skipped if the circuit board and chip are being replaced on an
RF5 Zero module. Refer to Figure 5.
6.
With all the connectors removed from the circuit board remove the two
screws holding the circuit board in the housing, as shown in Figure 6.
7.
As depicted in Figure 7, remove the old circuit board and chip and install
the replacement components.
8.
Repeat steps 6 through 3, in reverse order, screwing the circuit board back
in place, reconnecting the two-wire solenoid connector, the three-wire
pressure sensor connector and the temperature sensor. Set the battery
back in place, but do not plug in until ready for use. Reassembled module
should appear as shown in Figure 8. Module is now ready to be tested per
Service
Procedure
http://www.ankom.com/service-procedures-rf.aspx.
ANKOM Technology • 2052 O'Neil Road • email: service @ankom.com• Phone: 315-986-8090 • Fax: 315-986-8091
171
(SP-171)
which
can
be
found
at:
013
Service Procedure
Revised 07/15/2014
Figure 5
Figure 6
Figure 7
Figure 8
page 2 of 4