Ankom RF Servis Prosedürü - Sayfa 3
Ölçüm Cihazları Ankom RF için çevrimiçi göz atın veya pdf Servis Prosedürü indirin. Ankom RF 4 sayfaları. Gas production system chip and board replacement
9.
As depicted in Figure 9, lift gently on the underside of the front edge of the
chip near the antenna until the front edge lifts slightly from the circuit
board.
10.
Lift gently on the bottom left corner of the chip until the corner lifts
slightly from the circuit board.
11.
At this point, the chip should be dislodged enough from the circuit board
that you should be able to lift the chip from the circuit board by lifting
gently on the antenna. If the chip is still snug in the circuit board, repeat
steps 9 and 10, and try lifting up on other sides of the chip. Note: Pulling
too hard may break the antenna from the chip.
12.
Insert new chip on circuit board so both rows of pins on the back of the
chip connect into the outer rows of holes in the two rows of black sockets
on the circuit board. Be sure that each pin has a hole to mate with, and
that the bottom edge of the board is nearly flush with the white
Temperature Sensor connector. Press firmly on top of both rows of pins as
shown in Figure 12 to make sure the chip seats in the circuit board
properly.
ANKOM Technology • 2052 O'Neil Road • email: service @ankom.com• Phone: 315-986-8090 • Fax: 315-986-8091
013
Service Procedure
Revised 07/15/2014
Figure 9
Figure 10
Figure 11
Figure 12
page 3 of 4