Daikin FTKS60KVM Servis Kılavuzu - Sayfa 12

Hava Kontrol Cihazları Daikin FTKS60KVM için çevrimiçi göz atın veya pdf Servis Kılavuzu indirin. Daikin FTKS60KVM 20 sayfaları. Removal procedure, 5.0/6.0/7.1 kw class, 15000/18000 btu/h class
Ayrıca Daikin FTKS60KVM için: Servis Kılavuzu (20 sayfalar)

Daikin FTKS60KVM Servis Kılavuzu

PCBs

7. PCBs
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step
1
Remove the screw on
the electrical box.
2
Unfasten the hook and
remove the shield plate.
3
Unfasten the 2 hooks
on the top and remove
the signal receiver unit.
10
All manuals and user guides at all-guides.com
Procedure
Electrical box
Shield
plate
Hook
Signal receiver
unit
Points
(R17747)
The shield plate also has 2
hooks on the upper side (at
the back).
(R13224)
(R2781)
Removal Procedure
Si041254EE