Duratuf SG2520 Montaj Talimatları Kılavuzu - Sayfa 3

Dış Mekan Depolama Duratuf SG2520 için çevrimiçi göz atın veya pdf Montaj Talimatları Kılavuzu indirin. Duratuf SG2520 16 sayfaları.

CONGRATULATIONS ON PURCHASING A DURATUF SENTRY SHED.
BEFORE YOU BEGIN THE ASSEMBLY PLEASE NOTE SOME IMPORTANT POINTS

Read all instructions carefully

Identify all parts and check quantities against parts list

Select a level site

Do not mark cladding with pencil as lead can cause corrosion to cladding

During assembly, ensure all drill filings are removed between layers of steel, before riveting together

Do not attempt to build your shed in high winds

Beware of sharp edges, recommend use of gloves

Protect your eyes and ears

For ease of assembly, use a friend to help
DRILL
HAMMER
Following are the minimum requirements for cladding used in Sentry Sheds.

Wash all surfaces annually using a hose and soft nylon brush.

Within 2 km of coast – wash every 3 months as above. After a storm, wash the cladding and the gutters as soon
as possible to remove any highly corrosive salt deposits.

Volcanic Ash Fallout – wash as soon as possible, removing fall out from roof and gutters.

Do not allow manures, chemicals or other corrosive materials to have direct contact with cladding

BEFORE YOU START:

SAFETY:

TOOLS REQUIRED:

RIVETER
SQUARE DRILL BIT
NAIL PUNCH

WARRANTY REQUIREMENTS:

2
3.5 DRILL BIT
TAPE MEASURE
:
LADDER
PEN
.