Duratuf KIWI MK1A Montaj Talimatları Kılavuzu - Sayfa 13
Dış Mekan Depolama Duratuf KIWI MK1A için çevrimiçi göz atın veya pdf Montaj Talimatları Kılavuzu indirin. Duratuf KIWI MK1A 16 sayfaları.
MK1A BARGE & SPOUTING
Note: MK2 shown
Step 1: Position Barge Flashing (A102) on gable
ends. Position a Spouting (A103) and rivet
to the Barge Flashing at each end. Repeat
with other Spouting.
Step 1: Place shed in final position. Check the diagonal
measurements are the same and the shed is
level before fitting Floor. It is recommended that
the shed is anchored down with either a Duratuf
Bolt Down Kit or Duratuf Peg Down Kit depend-
ing on what the shed is sited on.
Step 2: Lay a Floor Board on top of Bottom Plates and
Joist and push up against end wall. Mark out
where Studs are. Cut checkouts with Electric
Jigsaw so Floor Board will fit around Studs.
Step 2: Centralise Barge Flashing on gable end
MK1A FLOOR
13
and rivet in place, one rivet into every
second Rib. Fit two rivets through top of
Barge into Rib. Repeat with other Barge
Flashing. Check Spoutings are straight,
then rivet to Roof one rivet every second
Rib.