DuraVent DPC2 Kurulum ve Kullanım Talimatları Kılavuzu - Sayfa 9

Havalandırma Davlumbazı DuraVent DPC2 için çevrimiçi göz atın veya pdf Kurulum ve Kullanım Talimatları Kılavuzu indirin. DuraVent DPC2 14 sayfaları. Factory-built 650 c chimney 6” & 7” dia

DuraVent DPC2 Kurulum ve Kullanım Talimatları Kılavuzu
3
EXTERIOR INSTALLATION (CONT'D)
Step 10: If the chimney passes through the roof, cut
a hole large enough to provide 2" clearance
between the chimney and the roof.
Step 11: Put the Roof Flashing in place. Seal the
joint between the roof and the flashing with
roofing compound.
For sloping roofs, place the flashing under the
upper shingles and on top of the lower singles.
Nail the flashing to the roof using roofing nails.
Place the storm collar around the chimney and
slide down on top of the flashing. Tighten it
with the bolt supplied and make sure the joint
is properly caulked.
Figure 11
NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.
Step 12: Attach the Rain Cap to the top of the chim-
ney. (see Figure 3).
9