APLOS ANGEL 600 GPD Kullanım Kılavuzu - Sayfa 6
Su Sistemi APLOS ANGEL 600 GPD için çevrimiçi göz atın veya pdf Kullanım Kılavuzu indirin. APLOS ANGEL 600 GPD 9 sayfaları. Direct flow reverse osmosis drinking water system
Installation Step
Before installation, please check that all components are included in the package.
Figure 1
Figure 2
Figure 3
Figure 4
I. Install the three-way ball valve (see Figure 1)
1.1 Take out the three-way ball valve from the
accessory box.
1.2 Close the water inlet valve.
1.3 Connect the water inlet three-way valve and the
ball valve (note that the threaded connection
should be sealed with padding material and
seal ring).
1.4 Reconnect the original water pipe.
1.5 Connect the PE pipe to the water outlet of the
three-way ball valve and reserve a certain
length of the PE pipe.
II. Install the tap (see Figure 2)
2.1 Confirm the installation location for the RO
tap and drill a hole.
2.2 Fix the tap in the installation position. Ensure
that the tap base does not rotate, the platform
and the water pipe connections do not leak.
2.3Connect the quick fitting with a PE pipe first,
then connect the other end of the quick fitting
to the tap, leaving suf ficient length for the
pipe .
III. Install the drain saddle (see Figure 3)
3.1 Install the drain saddle on the vertical drainpipe,
which is the recommended location.
3.2 Place the saddle on the drainpipe and align for
drilling.
3.3 Drill a hole in the drainpipe carefully. Be sure
not to penetrate the opposite side of the pipe.
Slip the front plate on one end of the tubing and
insert the tubing into the drilled hole for about
0.6''. Position the back plate on the drain pipe
by tightening the screws and nuts evenly while
leaving the tubing in the hole
IV. Connect pipes and power supply
4.1 Connect the pipe from the three-way ball valve
to the inlet water port and the pipe should be
connected securely to avoid leakage.
4.2 Connect the PE pipes from the tap to the RO
purified water and filtered water ports
4.3 Connect the drain water pipe to the drain port.
Do not install any valve on the drain water pipe.
4.4 Activate power supply. First, connect the power
adapter to the unit power port, and then plug it
into the socket
V. Start up and Inspection
5.1 Open the RO tap and the water inlet ball valve.
RO system will start working, automatically
flushing, and water will be discharged from the
drain pipe. After approximately 10 seconds, the
flushing will end, and the RO system ill be ready
to purify water. Water will flow through the filters
directly to the tap.
5.2 Stop the unit for inspection. Turn of f the tap.
The drain pipe will stop draining water, but the
system will continue operating until it is full of
purified water.
5.3 Pipeline inspection. During the trial operation,
check the parts, components, and connections
for leakage and looseness.
5.4 After installation and inspection drain water
from the RO tap for at least 10 min. Repeat at
least 3 times over the next 24 hours.
05