Aircommand Sparrow Mk4 El Kitabı - Sayfa 4
Klima Aircommand Sparrow Mk4 için çevrimiçi göz atın veya pdf El Kitabı indirin. Aircommand Sparrow Mk4 17 sayfaları. Air conditioning unit
Ayrıca Aircommand Sparrow Mk4 için: Kullanıcı El Kitabı (17 sayfalar)
1. Installation Position
Before beginning, mark out the position of the unit
considering the following important requirements:
• The air conditioner should be situated as centrally as
possible on the van, to ensure even air distribution.
• The Sparrow Mk4 may be oriented in any direction to the
normal direction of travel.
• When considering the installation position remember to
check for clearance around the plenum inside the van.
• Avoid an installation position where a bulkhead, cupboard
or light fi tting could interfere with the discharge air fl ow
from the plenum.
• Avoid an installation where a roof joining seam crosses
through the 14" square installation cut out.
It is important that the unit is never more than 5° from
the horizontal and the rear of the unit should never be
higher than the front when in use.
Contact Aircommand if your installation differs signifi cantly.
• The above outline on the left shows the minimum
clearance required around the Sparrow Mk4 unit on the
roof of the vehicle, distances shown are calculated from a
14" square hole (356 x 356mm).
• The above outline on the right shows the minimum
clearance required around the 14" square hole (356 x
356mm) in order to accommodate the plenum.
Installation
4
There should be a minimum
of 100mm clearance around
the perimeter of the unit to
allow for service access and
air fl ow to condenser.
Fig 1: Sparrow Mk4 clearances required around roof top unit.
14" x 14" (356mm)
Fig 2: The foot print of the rooftop unit, and the plenum,
measured from the hole.
Hot air is ejected from
this exhaust; consider
nearby roof hatch.
square hole