Great Lakes SR Series Kurulum Talimatları Kılavuzu - Sayfa 9
Raflar ve Standlar Great Lakes SR Series için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Great Lakes SR Series 12 sayfaları. 19" eia wall mount swing rack
Ayrıca Great Lakes SR Series için: Kurulum Talimatları Kılavuzu (8 sayfalar)
Top/Bottom
Brace (QTY. 2)
Side Brace
Nylon Shoulder Washer
STEP 1
Attach the top and bottom brace to swing rack sides using the 1/4 - 20 x 1/2"
carriage bolts and 1/4 - 20 hex nuts.
STEP 2
Close swing frame and attach using the shoulder bolts.
STEP 3
Mount the assembly to the wall with four lag screws (these are not provided;
The installer is to determine correct hardware for the type of wall). Mounting
holes are designed for 3/8" hardwares, 16" on center.
1/4-20 Hex Nuts w/Serrated
Flanges (QTY. 8)
Socket Head Shoulder Bolts
with 3/8" - 16 Thread (QTY.4)
1/4-20 x 1/2" Lg.
Carriage Bolts (QTY. 8)
Socket Head
Shoulder Bolts
with 3/8"- 16
Thread (QTY. 4)
M6 x 12mm Copper Ground
Studs, (1) On Swing Frame
and (2) on Swing Brace
Swing
Frame
9