ADEN POWERKIT GO Kullanım ve Montaj Kılavuzu - Sayfa 8

Bisiklet Aksesuarları ADEN POWERKIT GO için çevrimiçi göz atın veya pdf Kullanım ve Montaj Kılavuzu indirin. ADEN POWERKIT GO 16 sayfaları.

POWERKIT GO — ASSEMBLY INSTRUCTIONS
ADEN GmbH
ASSEMBLY
The following assembly steps can be carried out independently of
the assembly of the belt ring on the rear wheel.
We recommend mounting the drive unit on the built-in rear wheel.
To assemble the drive unit, the belt is first placed around the
drive pinion.
Now place the belt over the belt ring.
The belt must lie completely on the teeth of the belt pulley
Then press the lower pulley lightly against the belt ring, then
tighten the screw with a size 4 Allen key (approx. 3 Nm)
Correct belt tension:
7 teeth of the belt are in full contact with the drive pinion.
Assembly-Note:
The lower belt pulley is used to adjust the belt tension.
Too much belt tension: Increased resistance when turning the
rear wheel and high levels of noise.
Belt tension too low: no power transmission -> belt jumps over.
Press the roller firmly against the belt ring and then tighten the
screw with a size 4 Allen key (approx. 3 Nm)
Both surfaces of the roller must be in contact with the ring.
Assembly-Note:
By wiggling the motor, you can determine whether the roller is
properly seated or not.
www.aden-sports.com
EN | P. 8