SITE PREPARATION:
This DCS Professional Vent Hood has been designed to accommodate
installation into a
I) soffit structure
(ceiling mount), or, for sites without
a soffit structure.
2) directly into the wall through holes provided in the rear panel of the vent hood (wall mount). When
mounting the hood to a soffit, it is recommended
to also utilize the rear panel holes to gain addi-
tional stability and minimize any vibration
noise. We suggest that the final framing and wall finishing
be done with the vent hood at the site to more accurately locate ductwork
and electrical service.
CONSTRUCT
SOFFIT
FRAMING:
I) For a site with a soffit, use 2" x 4"s to construct the soffit framing as shown below in Fig. I. Note
that a minimum opening of 10" is needed to accommodate
the ductwork.
With the centerline of
the installation marked, nail down the 2" x 4"s (wide side down) so that their inner edges are those
specified from the centerline. -see Figs.I & 3 pg.7
Note: The second (outer) set 0f2"x #'s are not necessary on the 30"Models
installation.
2) Make 2 wood shims (2" x 10-1/2" x drywall thickness). Attach them to the framing as shown in
Fig.2. Mount shims flush with inner edges of framing and with front edges II-I/2"
from finished back
wall.
i
i
i
i l
"A" = Center line to inner edge
ii
Finished Drywall
of 2 x 4's. -see rigA.
J
L