Galvin Flowmatic Safe-Cell Ürün Kurulum Manualline - Sayfa 2
Sıhhi Tesisat Ürünleri Galvin Flowmatic Safe-Cell için çevrimiçi göz atın veya pdf Ürün Kurulum Manualline indirin. Galvin Flowmatic Safe-Cell 8 sayfaları. Concealed dual temperature basin assembly with controller
PRE - INSTALLATION
IMPORTANT:
-
INSTALLATION COMPLIANCE: Galvin Specialised products must be installed in accordance with these
installation instructions and in accordance with AS/NZS 3500, the PCA and your local regulatory
requirements. Water and/or electrical supply conditions must also comply to the applicable national and/or
state standards. Failing to comply with these provisions shall void the product warranty and may affect the
performance of the product (Refer supplied installation compliance sheet with the product).
-
Before proceeding with installation first check the solenoid valve supplied is suitable for the site water
pressure and conditions. If your water pressure is outside the stated range, please contact Galvin
Specialised.
-
Ensure all supply lines are flushed thoroughly to remove debris prior to the installation of this product. A line
strainer is supplied to protect the solenoid valve from debris.
-
We recommended a thermostatic mixing valve is used to provide pre mixed water to the valve and pressure
reduction valve may be required to comply with recommended maximum supply pressure.
-
Ensure that access to the push button, solenoid valve and transformer/GPO is available for future
maintenance when installing the components. It is recommended that isolating valves be installed upstream
to the solenoid valve to allow for servicing. All wiring must be able to be removed when installed into
cavities or walls, therefore, it is recommended that a minimum of 25mm conduit be used to house the
leads. The unit is supplied with 5 meters of lead on the transformer and a 5 meters lead from the solenoid.
Additional lead lengths may be accommodated up to a length of 5m but must be ordered separately.
-
Whilst our product designs consider a broad range of installation types and surfaces, it is important that
surfaces which fixtures are mounted to are flat and free from defect. This is especially important for our
Flowmatic
Safe-Cell
®
concealment of contraband. In addition to ensuring the products are fitted securely and in accordance with
the following instructions, consideration shall be given to the use of non-pick mastics such as BASF
Sonolastic "Ultra" to ensure a high quality and safe installation.
-
Most installation problems are due to damage to the unit during installation or the selection of an
inappropriate installation location. Select the location carefully and take care with the installation, consider
ease of operation for the end user.
GENERAL INSTALLATION REQUIREMENTS
-
Do not cut the wires or extended the existing leads without using a correct lead extension from Galvin
Specialised, as this will void warranty.
-
Suitable access to the service of all components must be provided.
-
It is recommended that acoustic dampening products or materials be used in facilities where increased
levels of sound protection is required. A water hammer arrestor may also be required.
-
The number of valves and simultaneous demand must be considered when sizing pipes. If other fixtures
are connected to the supply line, calculations of flow rates and pressures must be undertaken to ensure
adequate water supply.
-
Limit the number of changes of directions in pipe work. This will result in less friction loss, better valve
performance and reduce potential water cavitation noise.
-
We recommended fitting isolating valves before solenoid for easy servicing.
-
Do not apply heat near this product during connecting water line. Heat generated by soldering could
damage plastic or electrical parts and seals, and will void the warranty.
-
For personal installation assistance and spare parts, please call our head office on 1300 514 074 and
speak to our customer service staff.
range where special attention is required to minimise ligature points and areas for
®
Version 2, 30 August 2017, Page 2 of 8