Galvin Engineering TCS9J80C Kurulum Manüelleri - Sayfa 3

Banyo Armatürleri Galvin Engineering TCS9J80C için çevrimiçi göz atın veya pdf Kurulum Manüelleri indirin. Galvin Engineering TCS9J80C 7 sayfaları. Clinilever cp-bs hospital shower set w/ medi hand shower & 900 ss grab rail

Document No.: 001.00.10.16
Product Installation Guidelines
Version 1, 4 November 2022, Page 3 of 7
MOUNTING DETAILS – WALL TOP ASSEMBLY
Wall body
− Wall body must be G5/8" FI and body should be between
0 and 15mm behind the finished wall surface.
80/150 mm Wall Top Assembly
© Galvin Engineering Pty Ltd