Galvin Engineering TCS9J80C Kurulum Manüelleri - Sayfa 5

Banyo Armatürleri Galvin Engineering TCS9J80C için çevrimiçi göz atın veya pdf Kurulum Manüelleri indirin. Galvin Engineering TCS9J80C 7 sayfaları. Clinilever cp-bs hospital shower set w/ medi hand shower & 900 ss grab rail

Product Installation Guidelines
5. Fit grab rail into wall mount plate and tighten
lock nut firmly.
7. Cradle Installation
-
Fit the shower cradle to the grab rail as shown.
-
Position the cradle as desired then tighten the
cover of the cradle.
Elbow
9. Connect Flange Wall Outlet Elbow
-
Fit elbow over spigot and secure with grub
screw.
-
Using 2.5mm hex key supplied, tighten 5mm
grub screw.
© Galvin Engineering Pty Ltd
Hex Key
6. Screw flange cover to wall mount plate.
Flow Regulator
Spigot
8. Connect Flange Wall Outlet Elbow
-
Apply thread tape to wall spud. When applying
thread tape or sealant to the wall spud, ensure
the opening is not obscured. Failure to do so
may restrict or block the flow restrictor,
affecting the flow of water.
-
Remove spigot by loosening grub screw in
elbow.
-
Fit spigot to wall spud, ensuring the flow
regulator is in place and not damaged when
tightening the spigot.
10. Check Shower for correct operation
and leaks
-
Connect hose and shower head ensuring the
connection is secured, then turn on water supply.
Check for any leaks.
Document No.: 001.00.10.16
Version 1, 4 November 2022, Page 5 of 7
Grub Screw