Airflow Uno hab Kurulum Kiti - Sayfa 11

Kontrolör Airflow Uno hab için çevrimiçi göz atın veya pdf Kurulum Kiti indirin. Airflow Uno hab 16 sayfaları. Cavity wall decentralised mechanical ventilation with heat recovery unit
Ayrıca Airflow Uno hab için: Kurulum ve Kullanım Talimatları Kılavuzu (16 sayfalar), Talimatlar (2 sayfalar), Bakım Kılavuzu (2 sayfalar)

m
WARNING
m
CAUTION
© Airflow - we reserve the right to make changes without prior notice
Cleaning the heat exchanger and protection grille
6.2
m WARNING!
The unit must be isolated from the mains power supply before any maintenance and installation work or
before opening the electrical terminals compartment!
The Unohab heat exchanger is made of an easy-to-clean ceramic material. The ceramic heat exchanger can be
rinsed with warm clean water as part of the regular overall maintenance of the ventilation unit. Proceed as follows:
1. Remove internal grille (fig.17).
2. Pull out the two-part connector (fig.18) and detach.
Pull out
inner panel
3. Pull the unit from the wall sleeve using the pull-out cord (fig.19).
4. Remove ring seals (fig.20).
5. Remove the top EPP half shell labeled "TOP" (fig.20).
Unit
6. Remove ceramic heat exchanger from the EPP-half-shell (fig.21) for cleaning.
m
CAUTION!
Carefully remove the sealing tape (fig.21) before cleaning!
– rinse with clean warm water
Ceramic heat
exchanger
Protection
grille
Fan
Unohab Cavity Wall Installation Kit
fig.17
fig.19
Pull-out cord
11
Installation and Operating Instructions
Pull out
connector
"TOP"
Ring seal
Sealing tape
mRemove before cleaning!
Protection
grille
fig.18
fig.20
fig.21