Airflow Uno hab Installation Kit - Page 11
Browse online or download pdf Installation Kit for Controller Airflow Uno hab. Airflow Uno hab 16 pages. Cavity wall decentralised mechanical ventilation with heat recovery unit
Also for Airflow Uno hab: Installation And Operating Instructions Manual (16 pages), Instructions (2 pages), Maintenance Manual (2 pages)
m
WARNING
m
CAUTION
© Airflow - we reserve the right to make changes without prior notice
Cleaning the heat exchanger and protection grille
6.2
m WARNING!
The unit must be isolated from the mains power supply before any maintenance and installation work or
before opening the electrical terminals compartment!
The Unohab heat exchanger is made of an easy-to-clean ceramic material. The ceramic heat exchanger can be
rinsed with warm clean water as part of the regular overall maintenance of the ventilation unit. Proceed as follows:
1. Remove internal grille (fig.17).
2. Pull out the two-part connector (fig.18) and detach.
Pull out
inner panel
3. Pull the unit from the wall sleeve using the pull-out cord (fig.19).
4. Remove ring seals (fig.20).
5. Remove the top EPP half shell labeled "TOP" (fig.20).
Unit
6. Remove ceramic heat exchanger from the EPP-half-shell (fig.21) for cleaning.
m
CAUTION!
Carefully remove the sealing tape (fig.21) before cleaning!
– rinse with clean warm water
Ceramic heat
exchanger
Protection
grille
Fan
Unohab Cavity Wall Installation Kit
fig.17
fig.19
Pull-out cord
11
Installation and Operating Instructions
Pull out
connector
"TOP"
Ring seal
Sealing tape
mRemove before cleaning!
Protection
grille
fig.18
fig.20
fig.21