GREEN LOO CF 4 Manuel - Sayfa 8

Tuvaletler GREEN LOO CF 4 için çevrimiçi göz atın veya pdf Manuel indirin. GREEN LOO CF 4 11 sayfaları. Dry composting toilet

GREEN LOO CF 4 Manuel
Connect the excess liquids outlet via the purple hose to the excess liquids trench.
Install the pedestal according to the instructions supplied with the pedestal.
The vent outlet should be ideally placed at the front top of the unit (near the access hatch) but can
also be installed at the upper front of either side.
The CF 4 airflow requirement incorporates a continuous running fan (supplied). Consider how the
fan will be powered (240VAC or 12VDC). Ensure correct airflow of the fan away from the toilet.
Remember that warm air from the composting chamber (the composting process generates its own
warmth) naturally rises, and that sharp bends restrict airflow – designing the vent piping correctly
will improve operation. Avoid bends tighter than 45 degrees & in order to maximise air flow,
minimise the length of the piping between the composting container and the vent stack.
Warm air, holding moisture, entering a cold vent can result in condensation. Install the provided
Y-Junction and screw cap (your condensate trap) as per drawings.
Do not use pipe cement below the Y-junction – the push fittings should be tight enough for this
purpose. This allows you to exchange/service the fan and empty the condensate (moisture) trap as
required.
The below is an example as to a standard vent installation – there are many permutations possible and if in
doubt, contact us for discussion and guidance. The
and is readily available from your local hardware or plumbing supplier.
Cut a 76mm diameter hole in the front top of the unit and insert the Wallace seal - you may find this easier
if you warm the seal in hot water first.
Vent System - General Considerations

Vent Installation

100mm vent pipe
8
is not supplied for transport reasons