GREEN LOO CF 4 Manuel - Sayfa 7
Tuvaletler GREEN LOO CF 4 için çevrimiçi göz atın veya pdf Manuel indirin. GREEN LOO CF 4 11 sayfaları. Dry composting toilet
7
Cutting the waste hole in the CF 4 container and affixing the waste chute
Mark the centre of where the waste chute meets the CF 4. Remove the CF 4 and draw a 260mm circle and
cut out with a jigsaw or similar.
Cut the Dektite along the marked line to suit the 250mm chute and fit the Dektite centrally over the chute
hole, screwing it down with the self- tapping screws supplied.
Position the CF 4 back into its final position. Insert the waste chute through the floor into the Dektite on the
CF 4.