GREEN LOO CF 4 Manuale - Pagina 7

Sfoglia online o scarica il pdf Manuale per Servizi igienici GREEN LOO CF 4. GREEN LOO CF 4 11. Dry composting toilet

GREEN LOO CF 4 Manuale
7
Cutting the waste hole in the CF 4 container and affixing the waste chute
Mark the centre of where the waste chute meets the CF 4. Remove the CF 4 and draw a 260mm circle and
cut out with a jigsaw or similar.
Cut the Dektite along the marked line to suit the 250mm chute and fit the Dektite centrally over the chute
hole, screwing it down with the self- tapping screws supplied.
Position the CF 4 back into its final position. Insert the waste chute through the floor into the Dektite on the
CF 4.