GREEN LOO CF 4 Manual - Página 7
Procurar online ou descarregar pdf Manual para Casas de banho GREEN LOO CF 4. GREEN LOO CF 4 11 páginas. Dry composting toilet
7
Cutting the waste hole in the CF 4 container and affixing the waste chute
Mark the centre of where the waste chute meets the CF 4. Remove the CF 4 and draw a 260mm circle and
cut out with a jigsaw or similar.
Cut the Dektite along the marked line to suit the 250mm chute and fit the Dektite centrally over the chute
hole, screwing it down with the self- tapping screws supplied.
Position the CF 4 back into its final position. Insert the waste chute through the floor into the Dektite on the
CF 4.