GREEN SERIES FITNESS CIR-TM7000E-G Yükseltme Prosedürü - Sayfa 12
Koşu Bandı GREEN SERIES FITNESS CIR-TM7000E-G için çevrimiçi göz atın veya pdf Yükseltme Prosedürü indirin. GREEN SERIES FITNESS CIR-TM7000E-G 20 sayfaları. Suspension upgrade procedure
Ayrıca GREEN SERIES FITNESS CIR-TM7000E-G için: Prosedür (3 sayfalar)
2.16.
Once Step 2.15 is complete take out all pry items and let running deck rest on suspension.
Reinstall Rear Row #4 LT & RT Philips head 8mm x 30mm bolts. Estimate is 30 lbs of torque.
Note: Make sure to use blue Loctite on end of bolts.
2.17.
Continue back to Middle Front Row #2 and re-tighten 5mm allen bolt suspension to frame.
Estimate is 30 lbs of torque. Best way is to put #2 Phillips screw driver between deck and frame to
keep suspension grommet from going sideways. Note: Make sure the suspension stays straight
and not sideways hitting side of frame.
www.GreenSeriesFitness.com
©December 2014
Call Toll free at (800) 269-7130
12