GREEN SERIES FITNESS CIR-TM7000E-G Yükseltme Prosedürü - Sayfa 10

Koşu Bandı GREEN SERIES FITNESS CIR-TM7000E-G için çevrimiçi göz atın veya pdf Yükseltme Prosedürü indirin. GREEN SERIES FITNESS CIR-TM7000E-G 20 sayfaları. Suspension upgrade procedure
Ayrıca GREEN SERIES FITNESS CIR-TM7000E-G için: Prosedür (3 sayfalar)

2.12.
After completing step 2.11, reattach the 8mm x 40mm Philips head bolt back into front row #1
suspension with clip. Tighten to estimated 20 lbs of torque. Note: Make sure to use blue Loctite on
end of bolts.
2.13.
Go to rear of treadmill and take off both LT & RT rear deck Philips head 8mm x 30mm bolts. Pry
up the deck without damage at least 1" and secure with item like plastic or rubber handle wrench.
CAUTION: INJURY TO FINGERS AT THIS POINT WHEN NOT BEING CAREFULL.
www.GreenSeriesFitness.com
©December 2014
Call Toll free at (800) 269-7130
10