Fronius TPS 5000 Kurulum Talimatları Kılavuzu - Sayfa 12

Kaynak Sistemi Fronius TPS 5000 için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Fronius TPS 5000 20 sayfaları. Second earthing socket at rear
Ayrıca Fronius TPS 5000 için: Kurulum Talimatları Kılavuzu (20 sayfalar)

Fronius TPS 5000 Kurulum Talimatları Kılavuzu
Mounting the sec-
ond earthing
socket at the rear
Mounting the second earthing socket
Threading in the cable
Connecting the cable to the front current socket
12
(3)
(1+9)
(g)
(8)
(k)
(j)
(i)
(h)
(8)
(3)
1
IMPORTANT! The recess in the current so-
cket must point downwards.
2
(f)
3
(2)
Housing
(1)
Mount the rear (-) current-socket (1),
complete with its blanking cap (9):
-
Insert the rear (-) current-socket
(1), working from the outside to-
wards the inside
-
Insert insulating washer
-
Screw on the hexagonal nut
-
Tighten the hexagonal nut with the
torque wrench, width 32
-
Thightening torque 35 Nm
Thread the cable (8) through the rub-
ber lead-throughs (f) and (g)
Connect the cable to the front current
socket (1):
-
Put the belleville spring washer (i)
over the hexagon head screw (h)
-
Put the star (j) over the hexagon
head screw (h)
-
Put the cable lug of the cable (8)
over the hexagon head screw (h)
-
Put the cable lug of the existing
current cable (k) over the hexagon
head screw (h)
-
Screw the hexagon head screw
(h) into the current socket
-
Tighten the hexagon head screw
(h) with the torque wrench, width
19
-
Thighting torque 15 - 35 Nm