Kohler BodySpa K-1000 Kurulum Talimatları Kılavuzu - Sayfa 6

Banyo Armatürleri Kohler BodySpa K-1000 için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Kohler BodySpa K-1000 28 sayfaları. Tower custom hydro-massage system
Ayrıca Kohler BodySpa K-1000 için: Ev Sahibi El Kitabı (48 sayfalar)

Kohler BodySpa K-1000 Kurulum Talimatları Kılavuzu
D. TOWER MOUNTING FRAME PREPARATION
On one of the tower mounting studs, draw a pencil line
exactly 2-3/8" up from the flat surface of the seat deck. You
will use this mark to position the tower mounting frame at
the correct height. Be precise with this measurement.
E. PUMP BANDING STRAP CUT
NOTICE: This step is necessary to make your Kohler
BodySpa operate more quietly.
Use tin snips to cut the banding strap. When the banding
strap is cut, the pump base and pump will continue to rest
upon the plywood ledge that extends from under the
footbath.
F. INSTALL PLUMBING
CAUTION: Risk of damage to footbath bottom
and subfloor. Ensure a watertight seal on the
footbath drain connections.
When the footbath is securely positioned, connect and
leak test the drain and fittings.
NOTE:
An
access
maintenance.
AB
116290-2-
panel
will
simplify
future
Pump
Suction Line
Subfloor
6
2-3/8"
Banding Strap
Pump Base
Plywood
Ledge
Connect Here
Kohler Co., Kohler WI U.S.A.