Kohler Chablis K-2081 Kurulum Talimatları Kılavuzu - Sayfa 2

Banyo Armatürleri Kohler Chablis K-2081 için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Kohler Chablis K-2081 13 sayfaları. Vitreous china pedestal lavatory
Ayrıca Kohler Chablis K-2081 için: Kurulum Kılavuzu (16 sayfalar), Ev Sahibi El Kitabı (12 sayfalar)

Kohler Chablis K-2081 Kurulum Talimatları Kılavuzu

TOOLS REQUIRED

S
Level
S
Drill with assorted bits
S
Socket wrench with 8" (20.3cm)
extension and assorted sockets
S
Tape measure
S
Framing square

INSTALLATION

S
Rough-in the supplies and drain
piping and trap.
NOTE: The supply stop handles
cannot extend more than 4-3/4"
(12.1cm) from the finished wall when
in the open position.
S
Install sufficient backing behind
the finished wall to provide a
secure material for the anchoring
devices.
S
Install hanger to wall according
to roughing-in dimensions.
S
Apply four self-adhesive gaskets
(provided) on the top edge of the
pedestal
S
Mark the centerline on the floor.
S
Position the pedestal on the floor
centerline so the mounting hole
is approximately 8-3/8" (21.3cm)
from the finished wall.
S
Position the lavatory on the
hanger and pedestal.
S
Move the pedestal as required
to ensure proper fit in the
desired location.
NOTE: The
lavatory
supported by the hanger and
pedestal.
S
Check the lavatory placement.
S
Mark the center of each
anchoring hole on the wall, and
mark the floor through the hole
in the pedestal bottom.
S
Carefully remove the lavatory
from the pedestal. Then move
the pedestal from the area.
A
1010420-2-

MATERIALS REQUIRED

S
1/4" lag bolts and washers (6)
S
Wood screw and washer (1)
Lag
Bolts
Gaskets
Top of Pedestal
Finished
Wall
must
be
Anchoring
Holes
2
Kohler Co., Kohler, WI U.S.A.
Hanger
Pedestal
Mark Floor
Here