Kohler WELLWORTH LITE K-3414-PB Kurulum Talimatları Kılavuzu - Sayfa 4

Tuvaletler Kohler WELLWORTH LITE K-3414-PB için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Kohler WELLWORTH LITE K-3414-PB 8 sayfaları. Vitreous china reverse trap toilet

TO INSTALL NEW TOILET
Place new toilet upside down on padding. Firmly place
gasket on toilet outlet.
NOTE: If using gasket with integral plastic sleeve, make
sure the gasket is positioned facing away from the toilet.
Remove rag from closet flange before setting toilet.
Carefully align and lower toilet over the closet flange and
bolts.
CAUTION: Do not lift or rock toilet after placement;
a new gasket must be reapplied if you break the
watertight seal.
Apply full body weight to toilet rim to set seal.
Assemble bolt cap bases, washers, and nuts on exposed
T-bolts. Hand-tighten nuts, then tighten additional 1/2-turn
with wrench.
CAUTION: Overtightening may cause breakage
or chipping.
If T-bolts extend more than 1/4" from top of nut, cut off ex-
cess. Wipe away any residue. Install bolt caps.
TO INSTALL NEW TANK
Make sure the three tank bolts extend fully through the
holes in the gasket. Set the tank onto the bowl using the
bolts as a guide. Center the gasket on the inlet of the bowl.
Assemble the washers and brass hex nuts onto the bolts.
CAUTION: Overtightening may cause breakage
or chipping.
Alternately tighten the three brass hex nuts so that the top
of the tank is level with the top of the bowl and a watertight
seal is obtained.
AA
111784-2-
(9412)
Toilet Outlet
Gasket
Bolt Cap
Nut
Washer
Bolt Cap Base
Tank Bolt
Washer
Nut
4
Fig. #5
Fig. #6
Gasket
Fig. #7
Kohler Co., Kohler, WI