A.B.S. Flexilo MINI Montaj, Çalıştırma ve Doldurma Talimatları - Sayfa 18

Endüstriyel Ekipmanlar A.B.S. Flexilo MINI için çevrimiçi göz atın veya pdf Montaj, Çalıştırma ve Doldurma Talimatları indirin. A.B.S. Flexilo MINI 19 sayfaları. For wood pellets. construction: plug-in system galvanized

Operating and Assembly Instructions – A.B.S. Flexilo MINI for wood pellets

Final inspection

6 Final Inspection
Position of the extraction device
Check that the discharge neck is centered in the silo. Adjust the silo or extraction unit so that
the silo is centered exactly over the point of discharge.
Use the following check list to ensure proper assembly of the silo.
Check that all individual parts are bolted together properly.
Check that the top bars and frame legs (stands) are not askew (use a spirit level).
Check that the silo bag is suspended centrally.
Check that the filling and extraction systems are attached correctly.
Check that the nameplate is attached in a clearly visible location on a frame leg or the
filling line.
Check the room layout (wall and ceiling clearance, condition of the room, fixtures in the
room, room ventilation).
Have the frame earthed by a licensed electrician. The earth resistance must not exceed
106 Ω.
Check that the silo frame is anchored to the floor properly.
Check the stability of the silo frame overall.
Tighten the clamping rings and tension bands on the extraction system once again.
Subject to technical change
©A.B.S. Silo- und Förderanlagen GmbH
Right
RICHTIG
RICHTIG
Issue 09/2016
Wrong
FALSCH
FALSCH
Page 18 of 19