Allied Telesis SwitchBlade AT-SB4104-80 Hızlı Kurulum Kılavuzu - Sayfa 6

Anahtar Allied Telesis SwitchBlade AT-SB4104-80 için çevrimiçi göz atın veya pdf Hızlı Kurulum Kılavuzu indirin. Allied Telesis SwitchBlade AT-SB4104-80 11 sayfaları. Switchblade chassis and fan tray

Allied Telesis SwitchBlade AT-SB4104-80 Hızlı Kurulum Kılavuzu
6
Figure1: SwitchBlade rack crossbar.
5.
Remove any packaging and protective material
Inside the chassis: Check that the internal spaces are free of packaging and
protective material.
Outside the chassis: Check that all vents are free from obstruction.
6.
Insert the blank faceplates (if not factory fitted)
When inserting a faceplate, make sure the faceplate's metal back-panel is
aligned with the card guides (see Figure 2 on page -6).
Faceplates are mounted vertically in the SwitchBlade 8 chassis (AT-SB4108) and
horizontally in the SwitchBlade 4 chassis (AT-SB4104).
Figure2: Card guides.
Carefully slide the faceplate into the chassis. The faceplate's captive screws
should line up with the threaded holes on the chassis.
SwitchBlade Chassis and Fan Tray
SwitchBlade Support Bar
bottom card guide
C613-04029-01 REV C