Dell DX6000G Kullanıcı Kılavuzu - Sayfa 23
Sunucu Dell DX6000G için çevrimiçi göz atın veya pdf Kullanıcı Kılavuzu indirin. Dell DX6000G 48 sayfaları. Rack installation instructions — static rails
Ayrıca Dell DX6000G için: Sürüm Notları (7 sayfalar), Kurulum ve Yapılandırma Kılavuzu (23 sayfalar), Raf Kurulumu (2 sayfalar), Raf Kurulumu (2 sayfalar)
Installing the System in a Rack
If the DX6axyS system includes a rail kit, locate the Rack Installation
Instructions supplied with the rail kit. Follow the instructions to install the
rails in the rack unit and to install the DX6axyS system in the rack.
Cabling the Appliance
Locate the Dell DX6axyS Getting Started Guide that shipped with your
system and follow the instructions to attach the power cables and network
cables to the DX6axyS system. Connect the network ports to the cluster's
private network on the same IP subnet as the other storage nodes. The DX
Storage Node is preconfigured to network boot from the DX Cluster Services
Node and the NIC ports are preconfigured in balanced-alb modes.
Turning On the DX Storage Node
After cabling the storage node, turn it on, and verify that the network boot is
successful.
NOTE:
If the network boot is not successful, verify that the cables are correctly
connected to the private network.
Enabling Capacity in DX Cluster Services Console
The DX Storage Cluster capacity is licensed. To expand the cluster capacity,
you must purchase a capacity license. When you purchase a capacity license,
you receive a capacity license card that contains an activation code. Enter the
activation code in the DX Cluster Services console to enable the additional
cluster capacity.
NOTE:
The capacity is only applicable to the cluster in which it is entered.
To activate the additional capacity, follow the instructions in the Cluster
Services Node Installation and Configuration Guide.
Setting Up the DX Object Storage Platform
23