Dell PowerEdge 2650 Kurulum Kılavuzu - Sayfa 13

Sunucu Dell PowerEdge 2650 için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Dell PowerEdge 2650 20 sayfaları. Activating the integrated raid controller
Ayrıca Dell PowerEdge 2650 için: Kurulum Kılavuzu (26 sayfalar), Kurulum Kılavuzu (32 sayfalar), Bilgi Güncellemesi (14 sayfalar), Kurulum Kılavuzu (40 sayfalar), Değiştirme Kılavuzu (28 sayfalar), Talimatlar Kılavuzu (8 sayfalar), Manuel (42 sayfalar), Manuel (15 sayfalar), Manuel (42 sayfalar)

Dell PowerEdge 2650 Kurulum Kılavuzu
Flush-Mount Installation
The two-post rack kit is shipped with the brackets configured for center-mount installation.
To prepare the slide assemblies for flush-mount installation in the two-post rack, perform
the following steps:
Locate the two slide assemblies and place them, side by side, on a smooth work
1
surface, with the front ends of the slide assemblies toward you. Position both slide
assemblies so that the center brackets are facing upward (see Figure 1-5).
NOTE: To prepare the slides for flush-mount installation, remove the front
mounting bracket, rotate it 180 degrees, and reinstall it on the opposite slide
assembly.
Using a #2 Phillips screwdriver and an 11/32-inch wrench or nut driver, remove two
2
12-24 x 0.5-inch pan-head Phillips screws, two nuts, and two shoulder washers from
each front center bracket (see Figure 1-5).
Remove the front bracket from both slide assemblies.
3
Place the bracket from one slide assembly onto the threaded studs on the opposite
4
slide assembly, with the bracket turned 180 degrees so that the mounting flange faces
forward (see Figure 1-5).
Secure each front center-mount bracket (by its nuts and shoulder washers) by finger-
5
tightening them on their opposite slide assemblies using the two shoulder washers and
two nuts you removed in step 2 (see Figure 1-5).
The joined bracket becomes the new extended back bracket.
Repeat steps 4 and 5 to configure the other slide assembly.
6
2 - Po st Ra ck I n stallation
1-9