Dell PowerEdge 2900 Manuel - Sayfa 21

Sunucu Dell PowerEdge 2900 için çevrimiçi göz atın veya pdf Manuel indirin. Dell PowerEdge 2900 26 sayfaları. Tower-to-rack conversion guide
Ayrıca Dell PowerEdge 2900 için: Kurulum Bilgileri (11 sayfalar), Kurulum Kılavuzu (14 sayfalar), Kurulum Kılavuzu (10 sayfalar), Güncelleme (2 sayfalar)

Dell PowerEdge 2900 Manuel

Installing the Optional 1x2 Flex Bay Bracket

NOTE:
The rack front panel is keyed so that the 1x2 flex bay bracket installs in the opposite orientation as the
tower front panel.
1 Insert the 1x2 flex bay bracket three-quarters of the way into the peripheral bay.
2 Reconnect the power cable to the flex bay backplane. See Figure 1-8.
3 Reconnect the SAS cables to the connectors on the flex bay backplane. See Figure 1-8.
4 Push the flex bay bracket the rest of the way into the peripheral bay until the spring latch on top of the
peripheral bay engages.
Figure 1-8. Installing the Optional 1x2 Flex Bay Bracket
7
1
peripheral bay spring latch
4
power connector
7
flex bay
5
6
2
SAS cable (SAS_B_IN
connector)
5
1x2 flex bay drive bracket
1
2
3
3
SAS cable (SAS_B_OUT
connector)
6
slot key
Tower-to-Rack Conversion Guide
4
19