Dell PowerEdge 2900 Manuel - Sayfa 22

Sunucu Dell PowerEdge 2900 için çevrimiçi göz atın veya pdf Manuel indirin. Dell PowerEdge 2900 26 sayfaları. Tower-to-rack conversion guide
Ayrıca Dell PowerEdge 2900 için: Kurulum Bilgileri (11 sayfalar), Kurulum Kılavuzu (14 sayfalar), Kurulum Kılavuzu (10 sayfalar), Güncelleme (2 sayfalar)

Dell PowerEdge 2900 Manuel

Installing the System Cover

1 Lift up on the cover latch. See Figure 1-3.
2 Place the cover on top of the system and offset the cover slightly back so that it clears the chassis
hooks and lays flat on the system chassis.
3 Push the latch down to lever the cover into the closed position.
4 Turn the latch release lock clockwise to the locked position.
5 Replace the Kensington cable lock on the back of the chassis.

Installing the Shoulder Nuts and Plastic Filler Panels

1 Using a 3/8-inch or 10-mm nut driver, attach the 10-32 shoulder nuts included in the kit to the
shoulder mounts on each side of the system See Figure 1-9.
NOTE:
Tighten the shoulder nuts so that the bottom of the nut is tight against the system chassis.
2 Install the plastic filler panels into each of the three chassis cutouts on the left and right exterior
chassis walls. See Figure 1-9.
The system is ready to install in the rack.
20
Tower-to-Rack Conversion Guide