Dell Z9100-ON Kurulum Kılavuzu - Sayfa 17
Anahtar Dell Z9100-ON için çevrimiçi göz atın veya pdf Kurulum Kılavuzu indirin. Dell Z9100-ON 43 sayfaları. Open networking
Ayrıca Dell Z9100-ON için: Kurulum Kılavuzu (45 sayfalar), Kurulum Kılavuzu (45 sayfalar)
Figure 5. 1U Tool-less Configuration
2.
Align and seat the front flange pegs in the holes on the front side of the vertical post. See item 2.
3.
Repeat this procedure for the second rail.
4.
To remove each rail, pull on the latch release button on each flange ear and unseat each rail. See
item 3.
Configuring a Two-Post Flush-Mount
To configure a two-post flush-mount installation, follow these steps.
1.
For this configuration, remove the castings from the front side of each ReadyRails assembly. See the
following illustration, item 1. To remove the two screws from each front flange ear (on the switch
side of the rail) and remove each casting, use a Torx screwdriver. Retain the castings for future rack
requirements. It is not necessary to remove the back flange castings.
Install the Z9100–ON
17